Canal Cleanout Project

This project is taking place during the shutdown, but canal maintenance is a year around task

There were debris and vegetation on the banks of the canal that endangered flow and if left unchecked could cause flooding. Our team, along with Salt Lake County Flood Control have been busy during the March 15th - April 15th canal shutdown to clean up all of the debris and vegetation that could cause flow or flood problems.